M-TECH PLUMBING & BOILER REPAIRS
CREDIT CARDS ACCEPTED
 
Name
Telephone
Mobile
Email
Enquiry

Terms and Conditions


 
 

1) For the purpose of these terms and conditions, the following words shall have the following meanings: "Us/We" shall mean M-TECH plumbing. "You" shall mean you: the customer (the person or organisation for whom we agree to carry out works and/or supply materials). "Our representative" shall be the person we send to you to do work

 2) There is a minimum charge of 1 hour on all jobs plus parts plus VAT, thereafter work is charged per half hour (minimum). If upon arrival will diagnostic your problem or need parts to continue work which can not be collect on the day, our time will be chargable of 1 hour minimum. The total charge to the customer will be the time spent by our representative on the job, plus all reasonable time spent in obtaining materials, plus VAT. Parts and materials collected or supplied by M-TECH plumbing will be charged at price plus 30% handling charge. No supplier invoices will be submitted to the customer under any circumstances.

 3) Collecting material for a job: We try to minimise collection of materials by carrying everyday stock items. If we do need to collect materials we will always try to keep the time to a minimum.

4) Fixed Price work. Estimates will include labour and materials plus VAT. The price will be fixed but manifest errors shall be exempted. Estimates are simply what they say. We cannot be held responsible should the time or materials required be other than what was envisaged. Any part payment in advance for work cannont be refunded under any circumstances. Estimates may need to be revised if you change the scope of the work, if there is an increase in the price of materials, or if further works turn out to be needed to do the work. If it is impossible for us to do the work for the previously quoted fixed price, we will give you a free quote for the work so that you can choose to use us or not. If you decline the quote there will be no charges payable by you.

 5) Invoices are payable immediately at the end of each job. Invoices unpaid (in total or in part) will carry interest at 4% over the company's banker's base rate while any payment remains outstanding.

6) Time Keeping. We will make every effort to attend each job at the time and date agreed with you according to our standard terms and condition of sale. However, we cannot accept any liability for either arriving late of not at all, and for the late delivery or failure to supply materials.

7) You personally will be deemed to be our customer unless it is made clear to us who the customer is and we have confirmation that you have the right to instruct us on their behalf the customer must allow us the necessary access to carry out the work. Customers Responsibility. It is the responsibility of the customers to protect items of furniture, furnishings, fixings, fixtures and fittings. We will make reasonable efforts not to cause any damage, it is suggested that the customer removes items that is considered to be a problem. If it remains within the working area, it is the responsibility of the customers to cover such items. Wallpaper and paint can sometimes be damaged. It is the responsibility of the customers to take any protection actions felt necessary. We will try our best to put back bath panels, flooring, cupboards etc - areas we need to get access to. we cannont be held responsible for any damage caused to these items or to the way they have been put back. If damage to plaster and brickwork is caused it is the customers responsibilty to make good. We cannot except responsibilty for any damage caused to wallpaper, paintwork, tiles, carpet, furniture etc. Any silicon work does not carry any guarantee.. The customer is to obtain all necessary permission, from any landlord or local authority prior to starting the work. An electricity supply (220/240v) is often needed. The customer is to provide this supply and also a sutible standard outlet reasonably near to the work. The supply will be of no cost to us.

8) If you instruct us to do works or buy materials and then cancel, we reserve the right to charge you for the cost of any time and materials incurred by us. Charges will be those of our normal terms and conditions.

9) Guarantee. We provide a 12 month guarantee on all new installations and a 3 month guarantee on all repairs were parts have been changed / replaced. If you are not satisfied with our work, you must contact us, in writing, within the period of finishing the work and let us come and inspect the work and carry out the necessary remedial work at our expense. You agree that if you do not contact us within the guarantee period we shall have no liability. You agree to let our insurers inspect any works carried out by us.

10) Things we cannot cover. We are unable to guarantee our work, parts and equipment supplied to you: if they are misused, treated negligently or if our work is repaired, modified, or tampered with by anyone other than us. Where we carry out works for you using your materials we can take no responsibility for the quality, fitness for purpose or otherwise of these materials so we cannot accept responsibility for them.

11) We cannot guarantee work where you order us to carry out work against the advice of our representative. This advice will given to you either orally, or in writing. Our guarantee is also void if we indicate that further works need to be carried out.

12) We cannot guarantee (because of its nature) any work to unblock waste or drainage pipes. Nor can we guarantee further damage or defects caused by work that is not fully guaranteed or where recommended further work has not been carried out.

13) We cannot guarantee work on existing installations that are either inferior or over 10 years old nor can we guarantee the effectiveness or otherwise of our work in these cases.

14) We will only be liable for rectifying our own work and shall not be held responsible for any ensuing damage or claims resulting from this or other work overlooked or subsequently requested and undertaken at that time.

15) We shall not be held liable for any delay or consequences of any delay in performing our obligations if such a delay is due to any cause beyond our reasonable control and we shall be entitled to reasonable time extensions.

16) We shall be entitled to recover the costs or damages from any person or contractor whose negligence or faulty workmanship makes us liable to pay for those damages or rectification of work.

     
 
REQUEST A CALLBACK
 
FREE QUOTATION
 
5% DISCOUNT FOR LANDLORDS
 
FULLY INSURED
 
NO CALL OUT CHARGE
 
WE GUARANTEE OUR WORK
© 2010 M-Tech. All Rights Reserved  

Find M-tech Plumbing Services In Your London Area

   
     

North London

  • N1 islington
  • N2 east finchley
  • N3 finchley
  • N4 finsbury park
  • N5 arsenal
  • N6 highgate
  • N7 holloway
  • N8 turnpike lane
  • N9 lower edmonton
  • N10 muswell hill
  • N11 bounds green
  • N12 North finchley
  • N13 palmers green
  • N14 south gate
  • N15 south tottenham
  • N16 stoke newington
  • N17 tottenham
  • N18 upper edmonton
  • N19 upper holloway
  • N20 whetston
  • N21 winchmore hill
  • N22 wood green

  • North West London

  • NW1 camden town
  • NW2 dollis hill
  • NW3 hampstead
  • NW4 hendon
  • NW5 kentish town
  • NW6 kilburn
  • NW7 mill hill
  • NW8 st johns wood
  • NW9 colindale
  • NW10 willesden

  • East London

  • E1 whitechapel
  • E2 bethnal green
  • E3
  • E4 chingford
  • E5 clapton
  • E6 east ham
  • E7 forest gate
  • E8 dalston
  • E9 hackney
  • E10 leyton
  • E11 leytonstone
  • E12 manor park
  • E13 plaistow
  • E14 blackwell
  • E15 stratford
  • E16 north woolwich
  • E17 walthamstow
  • E18 south woodford

  • South East London

  • SE1 bankside
  • SE2 abbey wood
  • SE3 blackheath
  • SE4 brockley
  • SE5 camberwell
  • SE6 bellingham
  • SE7 charlton
  • SE8 deptford
  • SE9 mottingham
  • SE10
  • SE11 kennington
  • SE12 blackheath
  • SE13 hither green
  • SE14
  • SE15 peckham
  • SE16 rotherhithe
  • SE17 walworth
  • SE18 woolwich
  • SE19 crystal palace
  • SE20 anerly
  • SE21 dulwich
  • SE22 east dulwich
  • SE23 forest hill
  • SE24 herne hill
  • SE25 elmers end
  • SE26 sydenham
  • SE27
  • SE28 riverside

  • South West London

  • SW1
  • SW2 brixton
  • SW3 chelsea
  • SW1 clapham
  • SW5 earls court
  • SW6 fulham
  • SW7 south kensington
  • SW8 south lambeth
  • SW9 stockwell
  • SW10 west brompton
  • SW1
  • SW12 balham
  • SW13 barnes
  • SW14 mortlake
  • SW15 putney
  • SW16 streatham
  • SW17 tooting
  • SW18 earlsfield
  • SW19 wimbledon
  • SW20 south wimbledon

  • West London

  • W1 west end
  • W2 paddington
  • W3 acton
  • W4 chiswick
  • W5 ealing
  • W6 hammersmith
  • W7 hanwell
  • W8 kensington
  • W9 maida vale
  • W10 north kensington
  • W11 notting hill
  • W12 shepherds bush
  • W13 west ealing
  • W14 west kensington

  • Outer London

  • HA0 wembley
  • HA1 harrow
  • HA2 south harrow
  • HA3 harrow weald
  • HA4 ruislip
  • HA5 pinner
  • HA6 northwood
  • HA7 stanmore
  • HA8 edgware
  • HA9 wembley
  • IG2 ilford
  • IG3 seven kings
  • IG5 clay hill
  • IG6 barkingside
  • IG7 chigwell
  • IG8 woodford green
  • IG9 buckhurst hill
  • TW1 twickenham
  • TW10 richmond
  • TW11 teddington
  • TW12 hampton
  • TW13 feltham
  • TW14 hatton
  • TW15 ashford
  • TW16 sunbury-on-thames
  • TW17 shepperton
  • TW19 stanwell
  • TW2 twickenham
  • TW20 egham
  • TW5 hounslow
  • TW6 heathrow
  • TW7 isleworth
  • TW8 brentford
  • TW9 kew
  • UB1 southall
  • UB10 ickenham
  • UB11 stockley park
  • UB2 southall
  • UB3 hayes
  • UB4 yeading
  • UB5 northolt
  • UB6 greenford
  • UB7 west drayton
  • UB8 uxbridge
  • UB9 denham
  • WD3 rickmansworth
  • WD4 kings langley
  • WD5 abbots langley
  • WD6 borehamwood
  • WD7 radlett
  •